UA
Home
About
History of the ChNPP
Construction and Operation
Accident and its Elimination
Post-accident operation and shutdown
The full-scale war of russia against Ukraine
ChNPP Structure
Infocenter
News
Photos
Unofficial
Literature
Activity
ChNPP Decommissioning
Shelter object transformation
New Safe Confinement
Radioactive Material Management
Radioactive Waste Management
Spent Nuclear Fuel Management
International Technical Assistance Projects
ICCA Procurement
Contacts
Partners
Visit Chnpp
Technical visits and Mass media
Information Visits
Infocenter
Photos
History
SSE ChNPP photogallery
(~700)
SSE ChNPP panoramic pictures
Photos - History
View to the Chernobyl NPP site from Pripyat. 1983
View to the Chernobyl NPP site from Pripyat. 1983
View to the Chernobyl NPP site. 1984
View to the Chernobyl NPP site. 1984
Foundation pit for Power Unit 5
Foundation pit for Power Unit 5
Lesnoy - settlement of Chernobyl NPP and Pripyat construction pioneers
Lesnoy - settlement of Chernobyl NPP and Pripyat c...
Power Unit 1 turbine hall
Power Unit 1 turbine hall
Rally dedicated to Power Unit 1 commisioning. 1977
Rally dedicated to Power Unit 1 commisioning. 1977
Installation of drum-separator at Power Unit 1
Installation of drum-separator at Power Unit 1
Installation of upper steel shield plate of graphite column. 1977
Installation of upper steel shield plate of graphi...
Installation of main circulation pumps. Power Unit 3. 1981
Installation of main circulation pumps. Power Unit...
Installation of graphite stack
Installation of graphite stack
Installation of equipment at Unit control room
Installation of equipment at Unit control room
Installation of reactor by portal crane KP-640
Installation of reactor by portal crane KP-640
Installation of steam-water lines. Reactor hall of Power Unit 3. 1981
Installation of steam-water lines. Reactor hall of...
Installation of control and protection system elements. Reactor hall of Power Unit 2
Installation of control and protection system elem...
First cubic meter of concrete in main building foundation
First cubic meter of concrete in main building fou...
Power Unit 1 construction
Power Unit 1 construction
Power Unit 1 construction. 1975
Power Unit 1 construction. 1975
Construction of Chernobyl NPP II stage, ventilation stack (VS-2) installation
Construction of Chernobyl NPP II stage, ventilatio...
Power Unit 1 reactor hall
Power Unit 1 reactor hall
Power Unit 4 reactor hall. 1983
Power Unit 4 reactor hall. 1983
Ordering
Ordering Ascending
Ordering Descending
Title Ascending
Title Descending
Date Ascending
Date Descending
Rating Count Ascending
Rating Count Descending
Rating Ascending
Rating Descending
Hits Ascending
Hits Descending
Display Num
5
10
15
20
50
All
Play Slideshow
Pause Slideshow
Powered by
Phoca Gallery
Home
About
History of the ChNPP
Construction and Operation
Accident and its Elimination
Post-accident operation and shutdown
The full-scale war of russia against Ukraine
ChNPP Structure
Infocenter
News
Photos
Unofficial
Literature
Activity
ChNPP Decommissioning
Shelter object transformation
New Safe Confinement
Radioactive Material Management
Radioactive Waste Management
Spent Nuclear Fuel Management
International Technical Assistance Projects
ICCA Procurement
Повідомити про корупцію
План діяльності системи енергетичного менеджменту
Contacts
Partners
Visit Chnpp
Technical visits and Mass media
Information Visits
Культура захищеності