View to the Chernobyl NPP site from Pripyat. 1983
View to the Chernobyl NPP site from Pripyat. 1983
View to the Chernobyl NPP site. 1984
View to the Chernobyl NPP site. 1984
Foundation pit for Power Unit 5
Foundation pit for Power Unit 5
Lesnoy - settlement of Chernobyl NPP and Pripyat construction pioneers
Lesnoy - settlement of Chernobyl NPP and Pripyat c...
Power Unit 1 turbine hall
Power Unit 1 turbine hall
Rally dedicated to Power Unit 1 commisioning. 1977
Rally dedicated to Power Unit 1 commisioning. 1977
Installation of drum-separator at Power Unit 1
Installation of drum-separator at Power Unit 1
Installation of upper steel shield plate of graphite column. 1977
Installation of upper steel shield plate of graphi...
Installation of main circulation pumps. Power Unit 3. 1981
Installation of main circulation pumps. Power Unit...
Installation of graphite stack
Installation of graphite stack
Installation of equipment at Unit control room
Installation of equipment at Unit control room
Installation of reactor by portal crane KP-640
Installation of reactor by portal crane KP-640
Installation of steam-water lines. Reactor hall of Power Unit 3. 1981
Installation of steam-water lines. Reactor hall of...
Installation of control and protection system elements. Reactor hall of Power Unit 2
Installation of control and protection system elem...
First cubic meter of concrete in main building foundation
First cubic meter of concrete in main building fou...
Power Unit 1 construction
Power Unit 1 construction
Power Unit 1 construction. 1975
Power Unit 1 construction. 1975
Construction of Chernobyl NPP II stage, ventilation stack (VS-2) installation
Construction of Chernobyl NPP II stage, ventilatio...
Power Unit 1 reactor hall
Power Unit 1 reactor hall
Power Unit 4 reactor hall. 1983
Power Unit 4 reactor hall. 1983
 
 
Powered by Phoca Gallery