180°
ChNPP Units after sliding of New Safe Confinement’s Arch (2017) |
|
Interim Spent Nuclear Fuel Dry-type Storage Facility (ISF-2) (2016) |
|
Outdoor switchyard and NSC from bypass channel’s bridge (2014) |
360°
March 28, 1984 – Chornobyl NPP 4th Unit was put into design power 1 000 MW |
March 29, 2000 – Decree of the Cabinet of Ministers of Ukraine No.589 “On pre-scheduled shutdown of Power Unit No.3 and final shutdown of Chornobyl NPP” |