“SHELTER” OBJECT SAFETY STATUS REPORT. Volume 1.
“SHELTER” OBJECT SAFETY STATUS REPORT. Volume 2.
On November 29, 2016, the installation of the NSC Arch into the design position over the Object Shelter was completed |
30 November, 1996 – Unit 1 was finally shutdown |