On 2 November the ChNPP Director General Igor Gramotkin, representatives of the Plant administration and contracting organizations visited workplaces of personnel of contracting companies that implement a project on reinforcing and sealing the existing structures of ChNPP Generation II. The visit was conducted within the frame of control of the project progress and for monitoring of periods of its execution.
Some problematic issues that have significant influence on the project execution time were specified and discussed during the walk-round check. Ways of their solution were outlined.
This project has critical interaction with the NSC construction as the Arch cannot be slid into the design position and commissioned until the end walls are constructed.
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...
Обход об'єкту "Укриття" керівництвом ЧАЕС, 02 лист...