Within the NSC Project at the construction site the following works are being performed:
- Assembling of metal structures of eastern end wall of the Arch;
- Installation of girders for internal casing;
- Dismantling of jacking system;
- Assembling of external casing of the Arch (eastern end wall);
- Arrangement of inclined piles in the serviced area (northern slip foundations);
- Reinforcement of the serviced area foundation (northern slip);
- Operations on arranging an engineering building.
Assembling of metal structures of the Arch (till Lifting No.3)
Under design – 2,286 tons, performed – 88,35 tons (3,86%)
Arrangement of foundations in the Arch’s serviced area (northern slip):
Concrete: under design – 5,674.2 m3; placed – 272 m3 (4.79%);
Reinforcing steel: under design – 1,251.609 tons; manufactured – 356.717 tons (28.5%).
Arrangement of base concrete and insertion of inclined piles within serviced area (northern slip):
- Design concrete volume – 1,060 m3, placed – 1,058 m3 (99.81%);
- Design pile amount – 208 piles, placed till design mark – 178 piles (85.58%)