Spent Fuel Processing Facility (SFPF):

- Installation of a platform for servicing the gate mechanisms MIS-LD-04 and MIS-LD-01.
- Works on insulation of pipelines and heaters.
- Stamped of IAEA equipment. Mounting locks.

The following activities were also performed at the facility:

- Drilling holes and threading in CSM doors.
- The work on the crane SWP-CR-04 was resumed.
- The video camera bracket is remounted.
- Regular works on the construction site arrangement.
- Completing of executive & acceptance documentation according to the Contract.
- Development of test programs for technological units and systems.
- Development of a training program for Chornobyl Nuclear Power Plant personnel.
- Commissioning on main technological equipment and auxiliary.
- Individual (Autonomous) tests of PCMS DWC Handling System, FT Handling System, SRW Management System.
- Individual tests of the Cutting Machine SFA SFP-CS-205.
- Individual Test of Canister Handling and Transport System CHT TD 02.
- Individual tests of the security door SWP-SD-01.
- Finished  Individual testing trolley TD-05 in room 119.
- Functional tests of the crane SFP-CR-08 in room. 305.
- Finished 3 items of hoists.
- Testing of the control systems of nitrogen supply systems, argon supply, helium supply.
- Elimination of comments after Individual Test.
- Trial operation of PPS continues.

The general Contractor of the project is Holtec. Works at the site are being performed by Holtec subcontractors: CDI, UTEM, UTB, ZEM, EPI, BEM, Kranservis, Konditsioner. In total 138 persons were engaged in the works. 1 unit of lorry-loading, earth-moving and lifting machines were also used for fulfilling tasks at the site.

Select another date

Within the NSC Project at the construction site the following works are being performed:

 

- Erection of Arch steelwork:

* Installation of the sealing anker beams on the roofs of Block V.

- Technological building and auxiliary facilities:

* Installation of the following main systems:
   • Power supply system;
   • Ventilation, gas purification and conditioning;
   • Fire safety system;
   • Water supply and sewerage system;
   • Communication and industrial TV system;
   • Physical protection and access control system;
   • Integrated management and control system;
   • System of internal and transport connection;
   • Radiation monitoring system
* Work on grinding, pre-coating, coating, pouring, painting of floors, walls and ceilings inside the TB an FBAL is underway.

- Works on arranging the NSC internal and external space:

* Completion of fire and household water supply pipelines installation;
* Site improvement activity;
* Weather station establishment.

Other activity:

* Dismantling of the Turbine Hall light roof.

Select another date

Within the NSC Project at the construction site the following works are being performed:

 

- Erection of Arch steelwork:

* Installation of the sealing anker beams on the roofs of Block V.

- Technological building and auxiliary facilities:

* Installation of the following main systems:
   • Power supply system;
   • Ventilation, gas purification and conditioning;
   • Fire safety system;
   • Water supply and sewerage system;
   • Communication and industrial TV system;
   • Physical protection and access control system;
   • Integrated management and control system;
   • System of internal and transport connection;
   • Radiation monitoring system
* Work on grinding, pre-coating, coating, pouring, painting of floors, walls and ceilings inside the TB an FBAL is underway.

- Works on arranging the NSC internal and external space:

* Completion of fire and household water supply pipelines installation;
* Site improvement activity;
* Weather station establishment.

Other activity:

* Dismantling of the Turbine Hall light roof.

Select another date

Spent Fuel Processing Facility (SFPF):

- Preparatory works on installation of structures the IAEA cabinet in 107с.
- The cable was replaced and the connection was disconnected from the transport trolley in p. 119.
- Installation of a platform for servicing the gate mechanisms MIS-LD-04 and MIS-LD-01.
- The water heaters are piped according to the issued changes in the working documentation.
- Works on insulation of pipelines and heaters.
- Installation of IAEA equipment in p. 307B, 109B, 109A, 603.
- Mounting of visors over RMS devices.

The following activities were also performed at the facility:

- Drilling holes and threading in CSM doors.
- Regular works on the construction site arrangement.
- Completing of executive & acceptance documentation according to the Contract.
- Development of test programs for technological units and systems.
- Development of a training program for Chornobyl Nuclear Power Plant personnel.
- Commissioning on main technological equipment and auxiliary.
- Finished Individual tests of the  ventilation and air conditioning system of the Gate House.
- Functional tests of crane SFP-CR-01 room. 119.
- Individual (Autonomous) tests of PCMS DWC Handling System, FT Handling System, SRW Management System.
- Individual tests of the security door SWP-SD-01.
- Finished Individual tests of autonomous power supply system.
- Finished Integrated testing of the Sewerage and Sewage Systems (Removing Remarks).
- Finished Individual tests of the working and emergency lighting systems of the SFPF.
- Finished Individual tests of the Removable Platforms SFP-PL-01.
- Individual tests of the Cutting Machine SFA SFP-CS-205.
- Individual testing Systems for manipulating and transporting a pencil case (CHTS) CHT-TD-02 (room 119).

The general Contractor of the project is Holtec. Works at the site are being performed by Holtec subcontractors: CDI, UTEM, UTB, ZEM, EPI, BEM, Kranservis, Konditsioner. In total 141 persons were engaged in the works. 1 unit of lorry-loading, earth-moving and lifting machines were also used for fulfilling tasks at the site.

 

November 22, 2017
November 22, 2017
November 22, 2017
November 22, 2017
November 22, 2017
November 22, 2017

Select another date

Within the NSC Project at the construction site the following works are being performed:

 

- Erection of Arch steelwork:

* Preparatory work before the sealing anchors and the sealing membrane installation at the block V.

- Technological building and auxiliary facilities:

* Installation of the following main systems:
   • Power supply system;
   • Ventilation, gas purification and conditioning;
   • Fire safety system;
   • Water supply and sewerage system;
   • Communication and industrial TV system;
   • Physical protection and access control system;
   • Integrated management and control system;
   • System of internal and transport connection;
   • Radiation monitoring system
* Work on grinding, pre-coating, coating, pouring, painting of floors, walls and ceilings inside the TB an FBAL is underway.

- Works on arranging the NSC internal and external space:

* Completion of fire and household water supply pipelines installation;
* Site improvement activity;
* Weather station establishment.

Other activity:

* Dismantling of the Turbine Hall light roof;
* Drilling of holes at Block V for subsequent installation of sealing anchors.